Every Verti-lift™ consists of four major parts: The U-Dock, The Power Channel, The Lifting Assembly, and The Cable System.

U-DOCK

The U-Dock consist of the following components:

  • Bridge Deck - the dock section at the base of the U-dock that connects the side "finger" sections and contains mounting saddles for placement of the power channel.
  • Fingers (Side Sections) - the dock sections that form the sides of the U-dock and contain the supports that capture and guide the lifting assembly (see below). These side sections are also equipped with pre-mounted turning sheaves (pulleys) that lead the cables to the power channel.
  • Corner Sections - mitered dock sections (4' x 4' x 45 deg) that stablize the Verti-Lift™ and provide access to the bow of the boat.
  • Floats - large floats that attach to bottom of U-dock Assembly via the internal nut channels using Z-clips.
  • Decking - preassembeled 4 x 4 deck sections that drop in to the top of the U-dock Assembly (as with any Eco-Flote™ dock).
  • Roof System (optional) - a rigid pitched roof structure or sundeck (with railing), constructed of marine grade alumimum supports that attach to the external channels on the dock frames.

These six components are assembled together to form the U-dock. The components below, including the power channel, lifting assembly, and cable system are added into the assembled U-dock to create a complete Verti-Lift™.

POWER CHANNEL

The power channel consists of a 9" x 4 " heavy duty (.290 inch thick) aluminum rectangular channel (with hinged 9" x 4" cover) containing the entire drive and control mechanism. This mechanism includes the gear motor (page entitled Drive Specifications), jaw coupler, load bearing, stationary load bracket (support pedastal), stainless steel drive screw, moving drive bracket (where cables from lifting assembly attach , and the sheaves (pulleys) that guide the cables. The power channel is shipped as a complete unit which is bolted to the bridge deck via mounting saddles.

LIFTING ASSEMBLY

  • C-channels - verticle posts that extend from the side sections of the U-dockdown into the water beneath the boat. Each pair of C-channels captures and guides a horizontal lifting beam that spans the area between the "fingers".
  • Horizontal Lifting Beams - 8 by 3 inch heavy duty aluminum beams that slide up and down within the C-channels when the power drive is activated.
  • Horizontal Sill - an aluminum L-beam that attaches to the C-channel and runs parallel to the horizontal lifting beams. It holds the beams in place and stabilzes the lifting assembly.
  • Bunker System - padded adjustable bunks that cradle your boat as it rests on the lifting beams.

CABLE SYSTEM

We use 3/8 inch flexible cable with swaged studs (ends) to connect the lifting beams to the power drive. Each stud includes heavy duty stainless steel adjusting nuts that firmly secure the cable and allow you to perfectly balance the lift. The entire cable system precludes the possibility of cable override and dislodgement.

ACCESSORIES

The Verti-Lift™ utilizes the same ramps, hinges, anchoring systems and accessories (i.e. cleats, bumpers, ladders, benches, etc.) as the rest of the Eco-Flote™ System.For more information, navigate to the web pages for those specific items.




 